Conveyor Belt System Project for the Abu Tartour Phosphoric Acid Plant
Client: Dong Yang, South Korea. Surveying works for the conveyor belt system transporting the product from the crusher area to the Abu Tartour Phosphoric Acid Plant.
Surveying works carried out for Dong Yang, South Korea, as part of the conveyor belt system project designed to transport the product from the Crusher Area to the Abu Tartour Phosphoric Acid Plant. The surveying scope supported the execution of the project by providing the required survey data and measurements for the conveyor routes and associated structures, helping ensure accurate site execution and proper alignment between the different project components in accordance with the site requirements and engineering drawings.
Scope of Work
Methodology
The work methodology starts with reviewing the available drawings and data, followed by establishing and connecting survey control points, conducting topographic and detailed surveys, setting out the designed elements on site, performing excavation and backfilling quantity calculations, and finally checking and validating the survey data and preparing the required survey deliverables.
Deliverables
- Control Point Network for the Plant and Roads
- Control Point Coordinates and Elevations List
- Detailed Topographic Survey
- Survey Drawings and Maps
- Digital Terrain Model (DTM/TIN)
- Road Corridor Data
- Road and Infrastructure Network Data
- Volume and Quantity Data and Calculations
- Final Survey Report






Project Details
- Client: DYP&F (DYPNF), South Korea
- Location: Abu Tartour, New Valley, Egypt
- Year: 2019
- Industry: Major Industrial Projects
- Equipment: Total Stations, GNSS RTK Receivers, and Automatic Levels