Surveying works for the construction of 34 buildings under the Social Housing Project in Wadi El-Natrun, Beheira Governorate

Total Surveying Office (TSO) was commissioned by Cairo General Contracting & Real Estate Investment Company to carry out the surveying works for the 34-Building Social Housing Project in Wadi El-Natrun, Beheira Governorate.

TSO's scope of work included pre-construction site surveying, topographic surveying, setting out the project boundaries and building axes, establishing excavation levels, and setting out the foundations, providing the required surveying data and references to support accurate construction in accordance with the approved drawings.

The scope also included landscape design for the project, as well as earthwork quantity calculations for excavation and filling.

The surveying works were carried out using Total Station, GPS/GNSS, and Level equipment, utilizing site coordinates and elevation data to produce the required surveying outputs.

The project was divided into two phases, with approximately 10 feddans allocated to each phase. TSO's role focused on the surveying and specialized technical works assigned to the office, supporting the project execution through accurate surveying, setting-out, and earthwork calculations.

Scope of Work

Topographic and surveying works, including project boundary and building axis setting out, excavation and foundation levels, landscape design, and earthwork quantity calculations.

Methodology

TSO’s methodology was based on carrying out site and topographic surveys, establishing the project boundaries and building axes, and setting out the required excavation and foundation levels using Total Station, GPS/GNSS, and Level equipment. The scope also included landscape design and earthwork quantity calculations, relying on accurate surveying data to support the project execution works.

 
Deliverables
  • Pre-construction site survey.
  • Topographic survey of the project site.
  • Project boundary and building axis setting-out drawings.
  • Excavation and foundation level setting-out.
  • Landscape design for the project.
  • Excavation and filling quantity calculations.
  • Surveying coordinates and elevation data required for project execution.

Surveying Project Image 01

Surveying Project Image 02

Surveying Project Image 03

Surveying Project Image 04

Surveying Project Image 05

Surveying Project Image 06

Surveying Project Image 07

Surveying Project Image 08

Surveying Project Image 09

Surveying Project Image 10

Share this project